Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 10/11/2019 in all areas

  1. I took this a few years ago..
    10 points
  2. (my son) the future rider that will never be
    7 points
  3. Probably this part of the station because it's curved.
    5 points
  4. Yes sir! I Already made it forgot to post it just gotta add the new brake run and Ill post it tonight when I get home. My bad y'all!
    5 points
  5. You gotta love that brake hill.
    5 points
  6. Bright orange rails: Circa 2009
    5 points
  7. I would assume that they have everything planned out. There's probably a certain day they want Zeus assembled by, and until then they can do smaller lifts with the other cranes. I could be wrong though.
    5 points
  8. So it appears they lofted the track piece up, and now they're doing something to the support that was previously installed. It's swaying back and forth, so it appears they're having to do some sort of adjustment with it. It appears they resolved whatever it was. Another support going up now. For those unsure of where the brake run begins, it'll start somewhere in the circle, based on the blueprints. Edit for 11:19 AM since the forum is so slow: Another track piece is being strapped up to be lifted onto the new support.
    5 points
  9. 5 points
  10. Taken during Winterfest in 2018. Sent from my SM-G960U using Tapatalk
    5 points
  11. From cranedude07 on Instagram:
    4 points
  12. That is the compressor hut for the trim brakes.....
    4 points
  13. From the Field of Scrams line.
    4 points
  14. From Tony's Welding & Fabrication on Facebook: https://m.facebook.com/story.php?story_fbid=2723881017657567&id=140363059342722
    4 points
  15. 4 points
  16. And with that ladies and gentlemen, just over 10% of Orion has been erected! Woo Hoo!
    4 points
  17. Bumping this a bit, but wanted to share my Bat souvenir alongside @Alex103 and @standbyme. At work I have an original The Bat mug next to a new The Bat mug, both for holding pens and what-not. I don't remember where or how I got the original Bat piece, but I've had it for years now.
    4 points
  18. Removed photo since it wasn’t an entry.
    4 points
  19. I mean i tried but lets have @JonahWilliamson deal with the simulation ...
    3 points
  20. I can't wait to see that giant brake run peeking over the fence. Edit: @JonahWilliamson Could you fill in the track progress so far on the simulation?
    3 points
  21. Everything is absolutely planned out. Zeus will go up when they plan for him to go up. Another brake run piece going up now.
    3 points
  22. Good morning guys!! Happy Friday!! Who's ready to see Orion in person this weekend!! I know I am!
    3 points
  23. It should be topped off by the end of the month if weather permits. They are ahead of schedule. Sent from my iPhone using Tapatalk
    3 points
  24. Any idea what this building will be used for?
    2 points
  25. Does anyone know what happened to those unpainted crane pieces in the parking lot from about two months ago?
    2 points
  26. Walking in from the employee lot and there are white boom components in the lot on the north corner
    2 points
  27. First time poster, long time reader here. Gotta say, these pictures make me even more disappointed that Vortex is closing, I just dont understand it I guess. Lots of childhood memories of this ride like many others have said on here already. But some awesome pictures here guys
    2 points
  28. The brake run piece was put in!
    2 points
  29. Yeah, they know what they are doing. We just don't know the plan. It's probably just not planned to put Zeus up quite yet. Let's just go with the flow and enjoy watching construction.
    2 points
  30. They could probably tear down the building (preferably still a mine themed queue with the existing structure though) and put in a more standard top spin there that is open with thematic elements around it. They could give it a lumber theme similar to Buzzsaw at Walibi Belgium or Ripsaw at Alton Towers. This could tie in with the Miami River Lumber Co. in that section as well.
    2 points
  31. Haven't seen the cams since Tuesday... what a sight to wake up to this beautiful Friday morning!
    2 points
  32. I’m sure they hired an outside firm to produce the commercials. I wouldn’t hold my breath though, Yukon Striker & Copperhead haven’t received these animated commercials sadly. I personally love them. edit - Found them - https://carbonvfx.com/ 2nd edit - They wrote an article about Mystic Timbers editing process - https://carbonvfx.com/work/vfx/cedar-fair-mystic-timbers/
    2 points
  33. I took a similar photo during Winterfest. It did look abandoned.
    2 points
  34. Looks like the columns and the bar joists for the station are in as well.
    1 point
  35. Another brake run piece about to go up.
    1 point
  36. I really hope they make a animation for orion like this Mystic Timbers and Banshee one because its amazing!
    1 point
  37. Most of the deceleration is done by the magnetic brakes, which produce heat via eddy currents. The friction brakes are mainly used in applications where an on/off state is required (like trims or safety brakes). If you go back to the animation you can see how the mag brakes do most of the braking work which saves on replacing the pads.
    1 point
  38. Is this station really going up before West Coast Racer's station? lol
    1 point
This leaderboard is set to New York/GMT-05:00
×
×
  • Create New...