jcgoble3 Posted March 16, 2016 Share Posted March 16, 2016 I could subscribe to that logic for the möbius loop style. Whose logic? You posted at about the same times as chugh43, so I don't know who you're replying to. Quote Link to comment Share on other sites More sharing options...
calakapepe Posted March 16, 2016 Share Posted March 16, 2016 I could subscribe to that logic for the möbius loop style.Whose logic? You posted at about the same times as chugh43, so I don't know who you're replying to.Oops. Thanks. Didnt realize. It was to your reply. Like I could understand why you might count it that way. But I guess technically to both since I like to use it the other way.-to reiterate. I don't see the debate when it comes to Kings Island's separate racing coasters. 1 Quote Link to comment Share on other sites More sharing options...
Imperial79 Posted March 16, 2016 Share Posted March 16, 2016 I know its not even close to Halloween yet, but I found this looking for old Hanna Barbara stuff from Kings Island. Its from 2009, showing the Hanna Barbara character's some of us grew up with in the park, taking part in the Howl-O-Fest event. I would have loved to have gone to this, just to take some pics. Maybe someone here went to this? http://attractionsmagazine.com/out-of-the-loop-hanna-barbara-characters-return-for-howl-o-fest/ 5 Quote Link to comment Share on other sites More sharing options...
calakapepe Posted March 16, 2016 Share Posted March 16, 2016 I remembered the costumes being better than that when I was a wee lad lol 3 Quote Link to comment Share on other sites More sharing options...
KIghostguy Posted March 16, 2016 Share Posted March 16, 2016 I went to Howl-O-Fest in 2009. I don't remember seeing the other characters, but I do remember seeing Scooby Doo and the gang. 5 Quote Link to comment Share on other sites More sharing options...
MDMC01 Posted March 16, 2016 Share Posted March 16, 2016 I'm the opposite. I consider Racer at Kennywood 1 whole credit. Gator does too. In my opinion: For a Möbius coaster, you have one complete track, not two separate. If you complete one, it's not one credit as you've not completed the circuit. You would have .5 credit. In order to get the full credit you would have to complete the circuit. Once you do, you have a solid single credit. I'm MDMC01 and I approve this message! Seriously, I do agree with you all (chugh/Gator/calakepepe) on the mobius coaster being 1 whole credit and only riding 1 side = 1/2 credit. 3 Quote Link to comment Share on other sites More sharing options...
calakapepe Posted March 16, 2016 Share Posted March 16, 2016 With only a month left and the area looking how it does.. it will be an interesting or mildly confusing month, me thinks.. 5 Quote Link to comment Share on other sites More sharing options...
rhyano Posted March 16, 2016 Share Posted March 16, 2016 How long does it take for testing for each ride would you guys say? Diamondback still has one train (I think) on the track right now 1 Quote Link to comment Share on other sites More sharing options...
teenageninja Posted March 16, 2016 Share Posted March 16, 2016 They'll get it done one way or another. 9 Quote Link to comment Share on other sites More sharing options...
KIghostguy Posted March 16, 2016 Share Posted March 16, 2016 They'll get it done one way or another. 6 Quote Link to comment Share on other sites More sharing options...
AZ Kinda Guy Posted March 16, 2016 Share Posted March 16, 2016 How long does it take for testing for each ride would you guys say? Diamondback still has one train (I think) on the track right now Few cycles for each ride/train on established rides and the mechanics are happy. 4 Quote Link to comment Share on other sites More sharing options...
jbum123 Posted March 16, 2016 Share Posted March 16, 2016 How long does it take for testing for each ride would you guys say? Diamondback still has one train (I think) on the track right now Few cycles for each ride/train on established rides and the mechanics are happy. Or until the State says they are happy. Which I believe is a certain amount of complete cycles. Terp? 4 Quote Link to comment Share on other sites More sharing options...
AZ Kinda Guy Posted March 16, 2016 Share Posted March 16, 2016 How long does it take for testing for each ride would you guys say? Diamondback still has one train (I think) on the track right now Few cycles for each ride/train on established rides and the mechanics are happy. Or until the State says they are happy. Which I believe is a certain amount of complete cycles. Terp? Keyword: mechanics....On established rides, the state inspectors aren't so much worried about number of cycles. They are generally more concerned with the safety of the ride. Such as restraints, E-Stop functionality, ETC 7 Quote Link to comment Share on other sites More sharing options...
The Interpreter Posted March 16, 2016 Share Posted March 16, 2016 Regulators are far more stringent with new installations. Existing rides in many states may cycle only once (or in some places, less than that). As always, New Jersey and California are different. Very much so. And Florida on the opposite end--large theme parks there do their own testing, inspection, etc. EDIT: Replied simultaneously! 8 Quote Link to comment Share on other sites More sharing options...
ProdigyRider Posted March 16, 2016 Share Posted March 16, 2016 When you're stalking the webcams, waiting and watching for the park to start testing the rides for upcoming season. Saw them putting the BLSC thru some paces this morning. The white train, on one of its runs, did not make it up the top of the helix hill, and actually rolled back down from where it came. First time I'd ever seen that happen! I have been on BLSC when it rolled back from the helix. That night of Haunt shall not be forgotten. 9 Quote Link to comment Share on other sites More sharing options...
BeeastFarmer Posted March 16, 2016 Share Posted March 16, 2016 I got my monthly e-mail from Kings Island, and no mention of the season pass preview for the dry side. It did highlight info for the waterpark preview. I am somewhat dismayed by this. 4 Quote Link to comment Share on other sites More sharing options...
Voicetek Posted March 16, 2016 Share Posted March 16, 2016 I've been waiting to hear about the Season Pass preview night as well. My wife and I remembered to renew our passes in time to receive that offer this year, so we're looking forward to going that night. 3 Quote Link to comment Share on other sites More sharing options...
Magenta Lizard Posted March 16, 2016 Share Posted March 16, 2016 DonKIPR has previously posted that eventually those of us who renewed by the deadline will receive an email with details about the preview night. Apparently they just haven't been sent yet. Hopefully in the next couple weeks. 4 Quote Link to comment Share on other sites More sharing options...
Infinity Posted March 16, 2016 Share Posted March 16, 2016 Delirium is testing!! Opening day is around the corner! 7 Quote Link to comment Share on other sites More sharing options...
Nick_Plummer Posted March 16, 2016 Share Posted March 16, 2016 BLSC's blue and red trains have been moved into the station 7 Quote Link to comment Share on other sites More sharing options...
jdawg1998 Posted March 16, 2016 Share Posted March 16, 2016 https://twitter.com/KingsIslandPR/status/710217297219231745 This is obviously a hint that we will be getting a new giga coaster for 2017, with a thunderstorm theme. Kings Island is storm ready. Hopefully we're all storm ready too - ready for 2017. 9 Quote Link to comment Share on other sites More sharing options...
TombRaiderFTW Posted March 16, 2016 Share Posted March 16, 2016 The 2016 map is now live! Check it out! 9 Quote Link to comment Share on other sites More sharing options...
calakapepe Posted March 16, 2016 Share Posted March 16, 2016 I'm ready for 2016 Edit- simultaneous! Horray! -- And there lies the answers for 2016 13 Quote Link to comment Share on other sites More sharing options...
Imperial79 Posted March 17, 2016 Share Posted March 17, 2016 Looks like they did add a Coca-Cola Refill stand in, Soak City like some people was hoping. That will be nice! 4 Quote Link to comment Share on other sites More sharing options...
silver2005 Posted March 17, 2016 Share Posted March 17, 2016 The one now located under the Eiffel Tower is a brilliant spot for one as well. 6 Quote Link to comment Share on other sites More sharing options...
CoastersRZ Posted March 17, 2016 Share Posted March 17, 2016 It is most curious that there is nothing in the spot of the former funnel cake stand... 8 Quote Link to comment Share on other sites More sharing options...
Tr0y Posted March 17, 2016 Share Posted March 17, 2016 The one now located under the Eiffel Tower is a brilliant spot for one as well. I think that one has been there, they just made special note of it on the park map so that people would get their refill there rather than hope into a food line. Also I noticed in the park map that there will be a railroad crossing for the new line for WWC. To me I find this strange, because it wouldn't seem cost affective because now there will have to be a security guard stand post there to make sure people don't cross when the train comes by. 7 Quote Link to comment Share on other sites More sharing options...
PKIVortex Posted March 17, 2016 Share Posted March 17, 2016 No different than at Cedar Point. They may make this a position for the ride ops working the train. Sent from my XT1254 using Tapatalk 5 Quote Link to comment Share on other sites More sharing options...
Italian Job 2005 Posted March 17, 2016 Share Posted March 17, 2016 How do they do it over at the Soak City bypass? Security guard or ride op? 2 Quote Link to comment Share on other sites More sharing options...
marth555 Posted March 17, 2016 Share Posted March 17, 2016 It seems that the majority of the FunPix spots are for onride photos 3 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.