Jump to content

Kings Island General Discussion 2025


Klabergian Empire
 Share

Recommended Posts

9 hours ago, Losantiville Mining Co. said:

Paramount? In my Kings Island? It's more likely than you think.

Jokes aside, I wonder what color everything will be when they're done. The roofing is that nice patina, but the wood trim looks like it will stay the same unless they paint it before Opening Day. 

I'm also curious as to what the new KI Trading Company facade looks like. The plans looked nice and only make me more excited for the next four weeks to go by quickly!

My guess is that it's just the roof that will be changing colors. This is based on the image posted by the park where there seem to be no signs of painting near the supports and the cherubs.

Based on this photo of Kings Dominion's Grand Carousel shelter, grabbed from Midwest Info Guide, the finished product may look something like this:

24-1.JPG

Interestingly while Kings Island, Kings Dominion and Canada's Wonderland use the same design for their carousel structures, Kings Island's was the only one of the three with a seam roof. KD and CW have a solid smooth surface.

  • Like 1
Link to comment
Share on other sites

This seems like a similar structure to the one in Action Zone (although with a different canopy setup). I'd hope they will keep it up all season and use it as a general seating space. 

My biggest complaint for it will be if they remove all of the trees from that space. Those paths are already so barren in spots so I'd hate to see more be taken out. 

  • Like 1
Link to comment
Share on other sites

11 hours ago, BeeastFarmer said:

Maybe this will turn into something semi-permanent...have another festooned structure across the way in the dead space between the pavement and the International Showplace.  

Reading the notes on the blueprint in the upper right, the fabric roof cannot withstand a heavy wet snow weight, so would expect the fabric roof to be removed for Winterfest (which then the question becomes will this area be utilized for Winterfest at all?) The other 115 mph wind note is highly unlikely and even with climate change and more frequent thunderstorms with straight line winds, still likely a very slight risk for the structure  (remember the Kings Island sign out front getting hit by a severe thunderstorm years back and having to be rebuilt?)

Link to comment
Share on other sites

I got bored and did a cost breakdown comparing 1 day at Epic Universe to 1 day at Kings Island to a Kings Island Gold Pass and thought I'd share it here.

I looked it up and here's the math for a Saturday 6/14 visit for anyone who's curious:

  • 1 Single Day Epic Universe Ticket 
    • $179.00
  • 1 Single Day Epic Universe Express Pass
    • $239.00
  • Tax (calculated at checkout)
    • $27.24

TOTAL COST: $446.23

That's nearly $500 for one person, not including travel, hotel, parking, food & beverage, or any other expenses. Everything was about $50-100 higher than the listed "Starting from" price. Not gonna lie, I expected it to be expensive, but it makes me happier about that being the same price for a Kings Island All Park Gold Pass with some of the bells and whistles on it. That cost breakdown for the same day at Kings Island is currently:

  • 1 2025 Single Day Admission to Kings Island
    • $55.00 (online price)
  • 1 all day Fast Lane wristband
    • $135.00
  • 1 2025 Premium All Day Dining
    • $45.99
  • 1 2025 Single Day Parking
    • $30.00
  • Processing Fee
    • $8.99
  • Tax (calculated at checkout)
    • $3.10

TOTAL COST: $278.08

And lastly for those wondering what you can get for $14 more than the price of admission to Epic Universe with an Express Pass, a new Gold Pass with the All Park Passport, Gold All Season Dining—All Park, and Drink Plan Plus Paper Cup is only $460.63 at checkout! That's for access to all Six Flags parks with food and beverage included for a good number of them. 

I'm not going to say they are even close to comparable experiences, but this just reinforced for me how good of a deal this is.

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

So how is this any different than what they had at the end of last year?

20 minutes ago, Old_Bearcat said:

Permit (BLD25-0259) filed for reconfiguration of the front gate queuing, security, and exit areas.  Looks to smooth things up a great deal.

They gotta boogey to get it done by April 19th ....

 

image.png

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...